HP Integrity rx5670 Hardware Installation Guide - HP Integrity rx5670 (A6837B/ - Page 12

Removing the Polystraps and Cardboard, Preparing to Roll Off the Pallet

Page 12 highlights

Server Overview and Unpacking Unpacking the Server 2. Lift the cardboard top cap from the shipping box. Figure 1-7 Removing the Polystraps and Cardboard fig013 3. Remove the corrugated wrap from the pallet. 4. Remove the packing materials. CAUTION The plastic wrapping material should be cut off rather than pulled off. Pulling the plastic covering off represents an ESD hazard. 5. Remove the bolts holding down the ramps and remove the ramps. 6. Remove the six bolts from the base attaching the rack to the pallet. Figure 1-8 Preparing to Roll Off the Pallet fig015 12 Chapter 1

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68

Chapter 1
Server Overview and Unpacking
Unpacking the Server
12
2. Lift the cardboard top cap from the shipping box.
Figure 1-7
Removing the Polystraps and Cardboard
3. Remove the corrugated wrap from the pallet.
4. Remove the packing materials.
CAUTION
The plastic wrapping material should be cut off rather than pulled off. Pulling the plastic
covering off represents an ESD hazard.
5. Remove the bolts holding down the ramps and remove the ramps.
6. Remove the six bolts from the base attaching the rack to the pallet.
Figure 1-8
Preparing to Roll Off the Pallet
fig013
fig015