HP LH4r HP Netserver LT 6000r Rack Cabling Guide - Page 65
Index
View all HP LH4r manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 65 highlights
Index A air flow in the rack, 31 C Cable Guide ensure installed, 33 cable inventory preparation checklist, 4 cable management ensure the Cable Guide is in place, 33 mount the Cable Management Arm, 33 planning for, 30 power cords within occupied area, 41 power cords within same EIA unit, 41 Cable Management Arm ensure installed, 33 cable routing cabling guidelines for the LT 6000r, 34 guidelines for server and peripheral connections, 40 overview of guidelines, 30 overview of procedure, 13 cabling SCSI cables from LT 6000r to Rack Storage/12, 35 capacity power block diagram, 51 circuit breakers site preparation, 5 configuring the system cabling to prepare for, 34 connecting electrical power unterminated power cords, 5 D data cables attach to components, 40 attach to server, 38 overview, 34 E electrical current requirements 100 VAC table of devices, 26 120 VAC table of devices, 27 200/208 VAC table of devices, 28 230/240 VAC table of devices, 29 F fan not required for perforated doors, 11 floor preparation checklist, 3 H hardware configuration preparation checklist, 4 high density configuration, 51 HP Console Switch use with LT 6000r, 35 HP NetServer LT 6000r cords, plugs, and receptacles, 17 voltages, 16 HP Rack Assistant, 30 M multiple rack bays tie together kit, 10 O operating environment checklist, 4 overview cabling the assembled rack, 13 data cabling, 34 P PDU. See Power Distribution Unit placement limitations due to cable length, 30 power cabling 61