HP ProLiant BL420c HP ProLiant BL420c Gen8 Server Blade Maintenance and Servic - Page 52

Install the FlexibleLOM, CAUTION, IMPORTANT

Page 52 highlights

14. Remove the processor from the processor retaining bracket. CAUTION: To avoid damage to the processor, do not touch the bottom of the processor, especially the contact area. 15. Install the processor socket protective cover in each processor socket. 16. Retain all of the information on the serial label pull tab for use in installing the new system board. To replace the system board: 1. Place the new server blade system board on a flat level surface. IMPORTANT: Install all components in the same configuration prior to removing the system board. 2. Install the FlexibleLOM ("FlexibleLOM" on page 36). 3. Install the mezzanine assembly ("Mezzanine assembly" on page 33). 4. Install the heatsink blank in processor socket 2 ("Heatsink blank" on page 32). Removal and replacement procedures 52

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85

Removal and replacement procedures
52
14.
Remove the processor from the processor retaining bracket.
CAUTION:
To avoid damage to the processor, do not touch the bottom of the processor,
especially the contact area.
15.
Install the processor socket protective cover in each processor socket.
16.
Retain all of the information on the serial label pull tab for use in installing the new system board.
To replace the system board:
1.
Place the new server blade system board on a flat level surface.
IMPORTANT:
Install all components in the same configuration prior to removing the system
board.
2.
Install the FlexibleLOM ("
FlexibleLOM
" on page
36
).
3.
Install the mezzanine assembly ("
Mezzanine assembly
" on page
33
).
4.
Install the heatsink blank in processor socket 2 ("
Heatsink blank
" on page
32
).