HP ProLiant BL420c HP ProLiant BL420c Gen8 Server Blade Maintenance and Servic - Page 59

Install the SAS controller

Page 59 highlights

3. Align the system board, and then slide it into place inside the base pan. 4. While holding the system board in place, turn the base pan on the side and install the two screws on the bottom of the base pan. 5. Place the server blade on a flat, level surface. IMPORTANT: Install all components in the same configuration prior to removing the system board. 6. Install the front panel/drive cage assembly ("Front panel/drive cage assembly" on page 43). 7. Install the heatsink blank ("Heatsink blank" on page 32). 8. Install the SAS controller ("SAS controller" on page 28). 9. Install and route the cables for all capacitor packs. For more information on routing the cables, see "FBWC capacitor pack cabling (on page 67)." 10. Install all DIMMs ("DIMMs" on page 31). 11. Install all DIMM baffles ("DIMM baffles" on page 29). Removal and replacement procedures 59

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85

Removal and replacement procedures
59
3.
Align the system board, and then slide it into place inside the base pan.
4.
While holding the system board in place, turn the base pan on the side and install the two screws on the
bottom of the base pan.
5.
Place the server blade on a flat, level surface.
IMPORTANT:
Install all components in the same configuration prior to removing the system
board.
6.
Install the front panel/drive cage assembly ("
Front panel/drive cage assembly
" on page
43
).
7.
Install the heatsink blank ("
Heatsink blank
" on page
32
).
8.
Install the SAS controller ("
SAS controller
" on page
28
).
9.
Install and route the cables for all capacitor packs. For more information on routing the cables, see
"FBWC capacitor pack cabling (on page
67
)."
10.
Install all DIMMs ("
DIMMs
" on page
31
).
11.
Install all DIMM baffles ("
DIMM baffles
" on page
29
).