HP R1500 HP R1500 G3 UPS User Guide - Page 17

Charging the UPS batteries, Powering up the UPS, Installing the optional UPS Network Module

Page 17 highlights

Charging the UPS batteries Allow the batteries to charge before putting the UPS into service. IMPORTANT: Charge the batteries for at least 24 hours before supplying backup power to devices. The batteries charge to: • 90% of their capacity within 24 hours • 100% of their capacity within 48 hours Powering up the UPS Press and hold the Power On/Standby button (1) until the UPS beeps. The Power On, Load 1 and Load 2 LEDs illuminate, indicating that power is available at the UPS output receptacles. Installing the optional UPS Network Module NOTE: It is not necessary to power down the UPS before installing the UPS Network Module. Installation 17

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51

Installation 17
Charging the UPS batteries
Allow the batteries to charge before putting the UPS into service.
IMPORTANT:
Charge the batteries for at least 24 hours before supplying backup power to
devices. The batteries charge to:
90% of their capacity within 24 hours
100% of their capacity within 48 hours
Powering up the UPS
Press and hold the Power On/Standby button (1) until the UPS beeps. The Power On, Load 1 and Load 2
LEDs illuminate, indicating that power is available at the UPS output receptacles.
Installing the optional UPS Network Module
NOTE:
It is not necessary to power down the UPS before installing the UPS Network Module.