Hotpoint HDF310PGRWW Installation Instructions - Page 5

Water Line Connection, PREPARE HOT WATER LINE, PREPARATION

Page 5 highlights

Installation Preparation PREPARE HOT WATER LINE NOTE: We recommend copper tubing for the water line, but if you choose to use flexible hose, use GE Appliances WX28X326, flexible braided hose. • The water supply line (3/8" copper tubing or flexible braided hose) may enter from either side, rear or floor within the shaded area shown in figure. • The water supply line may pass through the same hole as the electrical cable and drain hose. Or, cut an additional 1-1/2" diameter hole to accommodate the water line. If power cord with plug is used, water line must not pass through power cord hole. PREPARATION Locate the items in the installation package: • Screws • Junction box cover • Drain hose and clamp • Mounting brackets • Trim pieces (on some models) • Drain hose hanger • Insulation pieces (some models) • Toekick (pre-installed on some models) • Owner's Manual • Product samples and/or coupons Turn page to begin dishwasher installation. 1-1/2" Dia. Shut-off Hole 4" Valve Hot 2" 6" From Cabinet 19" From Wall Cabinet Face 2" From Floor Water Line Connection • If using a flexible braided supply hose, label the hose with the installation date to use as reference. Flexible braided hoses, elbows and gaskets should be replaced in 5 years. • Turn off the water supply. • Install a hand shut-off valve in an accessible location, such as under the sink. (Optional, but strongly recommended and may be required by local codes.) • Water connection is on the left side of the dishwasher. Install the hot water inlet line, using no less than 3/8" copper tubing or a flexible braided hose. Route the line as shown in PREPARE HOT WATER LINE section and extend forward at least 19" from rear wall. • Adjust water heater for 120°F to 140°F temperature. • Flush water line to clean out debris. • The hot water supply line pressure must be 20-120 PSI. 5

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32

Water Line Connection
• If using a flexible braided supply hose, label
the hose with the installation date to use as
reference. Flexible braided hoses, elbows and
gaskets should be replaced in 5 years.
• Turn off the water supply.
• Install a hand shut-off valve in an accessible
location, such as under the sink. (Optional, but
strongly recommended and may be required by local
codes.)
• Water connection is on the left side of the
dishwasher. Install the hot water inlet line, using no
less than 3/8” copper tubing or a flexible braided
hose. Route the line as shown in
PREPARE HOT
WATER LINE
section and extend forward at least
19” from rear wall.
• Adjust water heater for 120°F to 140°F temperature.
• Flush water line to clean out debris.
• The hot water supply line pressure must be 20-120
PSI.
Installation Preparation
PREPARE HOT WATER LINE
NOTE:
We recommend copper tubing for the water
line, but if you choose to use flexible hose, use GE
Appliances
WX28X326
, flexible braided hose.
The water supply line (3/8” copper tubing or flexible
braided hose) may enter from either side, rear or
floor within the shaded area shown in figure.
• The water supply line may pass through the same
hole as the electrical cable and drain hose. Or, cut
an additional 1-1/2" diameter hole to accommodate
the water line. If power cord with plug is used, water
line must not pass through power cord hole.
6"
4"
Cabinet Face
Shut-off
Valve
2" From Floor
19" From Wall
2"
From
Cabinet
Hot
1-1/2”
Dia.
Hole
5
PREPARATION
Locate the items in the installation package:
• Screws
• Junction box cover
• Drain hose and clamp
• Mounting brackets
• Trim pieces (on some models)
• Drain hose hanger
• Insulation pieces (some models)
• Toekick (pre-installed on some models)
• Owner’s Manual
• Product samples and/or coupons
Turn page to begin dishwasher installation.