IBM 865811Y User Guide - Page 51
Installing, options
UPC - 087944531869
View all IBM 865811Y manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 51 highlights
Installing options This chapter provides instructions to help you add options to your server. Some option-removal instructions are provided, in case you need to remove one option to install another. Exploded view of the Netfinity 5100 server The orange color on components and labels in your server identifies hot-swap or hot-plug components. This means that you can install or remove the component while the system is running, provided that your system is configured to support this function. For complete information about installing or removing a hot-swap component, see the detailed procedures in this chapter. The blue color on components and labels indicates touch points where a component can be gripped, a latch moved, and so on. The following illustration shows the locations of major components in your server. 1 Terminator card 2 Microprocessor 3 DIMM 4 Power supply 5 Fan 6 Adapter-retention bracket 7 Adapter-support bracket 8 Fan (blower) System board layout The illustrations in the following sections show the components on the system board. © Copyright IBM Corp. 2000 41