IBM BJ0NJML Integration Guide - Page 309

Process Control ID

Page 309 highlights

Collaboration Switch Additions After you perform this procedure, the INV collaboration switches will have the following values. Process Control ID System ID 1 INV THISMX INV EXT INV EXT INV ORC System ID 2 EXT THISMX EXT THISMX Process Control Value 1 1 1 0 For example, when you set the value of the ISUIN integration control to 1, the issue transactions are accepted from an external system. The INV collaboration switch controls the update of inventory balance and cost related to issues. You can adjust the setting of this switch, if necessary, so that the system bypasses that update process. The INV/EXT/THISMX collaboration switch controls the processing of inventory (Process Control ID = INV) that is issued in the external system (System ID 1 = EXT) and owned by the system (System ID 2 = THISMX). If the value of the INV/EXT/THISMX collaboration switch were 0, the inventory balance and cost values are updated. This is the default processing. If the value of the INV/EXT/THISMX collaboration switch were 1, the default processing is bypassed. The inventory balance and cost values are not updated. In the example, ISUIN accepts any issues into the system. The INV/EXT/THISMX collaboration switch determines how the inventory business component processes a specific type of issue. 295

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • 249
  • 250
  • 251
  • 252
  • 253
  • 254
  • 255
  • 256
  • 257
  • 258
  • 259
  • 260
  • 261
  • 262
  • 263
  • 264
  • 265
  • 266
  • 267
  • 268
  • 269
  • 270
  • 271
  • 272
  • 273
  • 274
  • 275
  • 276
  • 277
  • 278
  • 279
  • 280
  • 281
  • 282
  • 283
  • 284
  • 285
  • 286
  • 287
  • 288
  • 289
  • 290
  • 291
  • 292
  • 293
  • 294
  • 295
  • 296
  • 297
  • 298
  • 299
  • 300
  • 301
  • 302
  • 303
  • 304
  • 305
  • 306
  • 307
  • 308
  • 309
  • 310
  • 311
  • 312
  • 313
  • 314
  • 315
  • 316
  • 317
  • 318
  • 319
  • 320
  • 321
  • 322
  • 323
  • 324
  • 325
  • 326
  • 327
  • 328
  • 329
  • 330

Collaboration Switch Additions
295
After you perform this procedure, the INV collaboration switches will have the
following values.
For example, when you set the value of the ISUIN integration control to 1, the
issue transactions are accepted from an external system. The INV collaboration
switch controls the update of inventory balance and cost related to issues. You can
adjust the setting of this switch, if necessary, so that the system bypasses that
update process.
The INV/EXT/THISMX collaboration switch controls the processing of inventory
(Process Control ID = INV) that is issued in the external system (System ID 1 =
EXT) and owned by the system (System ID 2 = THISMX).
If the value of the INV/EXT/THISMX collaboration switch were 0, the inventory
balance and cost values are updated. This is the default processing.
If the value of the INV/EXT/THISMX collaboration switch were 1, the default
processing is bypassed. The inventory balance and cost values are not updated.
In the example, ISUIN accepts any issues into the system. The INV/EXT/THISMX
collaboration switch determines how the inventory business component
processes a specific type of issue.
Process Control ID
System ID 1
System ID 2
Process Control
Value
INV
THISMX
EXT
1
INV
EXT
THISMX
1
INV
EXT
EXT
1
INV
ORC
THISMX
0