IBM E02HMLL-I Implementation Guide - Page 240

Using, Integrated, Environment, Console, InterChange, Server, Express, views, Finding, Copying,

Page 240 highlights

Using the Integrated Test Environment Console and InterChange Server Express Console views As described in "Integrated Test Environment interface" on page 202, the Integrated Test Environment Console tab displays information about the execution of Integrated Test Environment and the InterChange Server Express Console displays information about the execution of InterChange Server Express. You can use the Integrated Test Environment Console view to determine when Integrated Test Environment tasks have completed and if they were successful. For instance, messages are written when Integrated Test Environment connects successfully to InterChange Server Express, or when Integrated Test Environment launches Map Designer Express to debug a map. If you started InterChange Server Express from within Integrated Test Environment, the InterChange Server Express Console view displays the logging and tracing output of the server, just as the MS-DOS console does. You can then use the view to troubleshoot the interfaces you are testing. It has the benefit that it is contained within the Integrated Test Environment perspective and can be conveniently searched. The following sections describe some tasks you will frequently want to perform when using the Integrated Test Environment Console and InterChange Server Express Console views. Finding text You might want to search the Integrated Test Environment Console or InterChange Server Express Console views for particular phrases. For instance, you might want to confirm that the InterChange Server Express started successfully. You could search the InterChange Server Express Console view for the text "is ready" to do so. Do the following to search the Integrated Test Environment Console or InterChange Server Express Console views for text strings: 1. Right-click in the Integrated Test Environment Console or InterChange Server Express Console view and select Find/Replace from the context menu. 2. Type the text string for which you want to search in the Find field. 3. Enable the Forward radio button to search the text after the cursor or enable the Backward radio button to search the text before the cursor. 4. Enable other options such as the Case Sensitive checkbox. 5. Click Find Next. Copying text You might want to copy text from the console views to show the text to other developers or Technical Support to get help with troubleshooting. To copy text from a console view, select the desired text, then right-click it and choose Copy from the context menu. Maximizing the view window As with all workbench editors and viewers, you can maximize the Integrated Test Environment Console or InterChange Server Express Console views by double-clicking their title bar. Although this is not useful with most viewers, it can 228 IBM WebSphere Business Integration Server Express and Express Plus: System Implementation Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • 249
  • 250
  • 251
  • 252
  • 253
  • 254
  • 255
  • 256
  • 257
  • 258
  • 259
  • 260
  • 261
  • 262
  • 263
  • 264
  • 265
  • 266
  • 267
  • 268
  • 269
  • 270
  • 271
  • 272
  • 273
  • 274
  • 275
  • 276
  • 277
  • 278
  • 279
  • 280
  • 281
  • 282
  • 283
  • 284
  • 285
  • 286
  • 287
  • 288
  • 289
  • 290
  • 291
  • 292
  • 293
  • 294
  • 295
  • 296
  • 297
  • 298
  • 299
  • 300
  • 301
  • 302

Using
the
Integrated
Test
Environment
Console
and
InterChange
Server
Express
Console
views
As
described
in
“Integrated
Test
Environment
interface”
on
page
202,
the
Integrated
Test
Environment
Console
tab
displays
information
about
the
execution
of
Integrated
Test
Environment
and
the
InterChange
Server
Express
Console
displays
information
about
the
execution
of
InterChange
Server
Express.
You
can
use
the
Integrated
Test
Environment
Console
view
to
determine
when
Integrated
Test
Environment
tasks
have
completed
and
if
they
were
successful.
For
instance,
messages
are
written
when
Integrated
Test
Environment
connects
successfully
to
InterChange
Server
Express,
or
when
Integrated
Test
Environment
launches
Map
Designer
Express
to
debug
a
map.
If
you
started
InterChange
Server
Express
from
within
Integrated
Test
Environment,
the
InterChange
Server
Express
Console
view
displays
the
logging
and
tracing
output
of
the
server,
just
as
the
MS-DOS
console
does.
You
can
then
use
the
view
to
troubleshoot
the
interfaces
you
are
testing.
It
has
the
benefit
that
it
is
contained
within
the
Integrated
Test
Environment
perspective
and
can
be
conveniently
searched.
The
following
sections
describe
some
tasks
you
will
frequently
want
to
perform
when
using
the
Integrated
Test
Environment
Console
and
InterChange
Server
Express
Console
views.
Finding
text
You
might
want
to
search
the
Integrated
Test
Environment
Console
or
InterChange
Server
Express
Console
views
for
particular
phrases.
For
instance,
you
might
want
to
confirm
that
the
InterChange
Server
Express
started
successfully.
You
could
search
the
InterChange
Server
Express
Console
view
for
the
text
“is
ready”
to
do
so.
Do
the
following
to
search
the
Integrated
Test
Environment
Console
or
InterChange
Server
Express
Console
views
for
text
strings:
1.
Right-click
in
the
Integrated
Test
Environment
Console
or
InterChange
Server
Express
Console
view
and
select
Find/Replace
from
the
context
menu.
2.
Type
the
text
string
for
which
you
want
to
search
in
the
Find
field.
3.
Enable
the
Forward
radio
button
to
search
the
text
after
the
cursor
or
enable
the
Backward
radio
button
to
search
the
text
before
the
cursor.
4.
Enable
other
options
such
as
the
Case
Sensitive
checkbox.
5.
Click
Find
Next
.
Copying
text
You
might
want
to
copy
text
from
the
console
views
to
show
the
text
to
other
developers
or
Technical
Support
to
get
help
with
troubleshooting.
To
copy
text
from
a
console
view,
select
the
desired
text,
then
right-click
it
and
choose
Copy
from
the
context
menu.
Maximizing
the
view
window
As
with
all
workbench
editors
and
viewers,
you
can
maximize
the
Integrated
Test
Environment
Console
or
InterChange
Server
Express
Console
views
by
double-clicking
their
title
bar.
Although
this
is
not
useful
with
most
viewers,
it
can
228
IBM
WebSphere
Business
Integration
Server
Express
and
Express
Plus:
System
Implementation
Guide