IBM x3800 User Guide - Page 38

serviceable

Page 38 highlights

Statement 8: CAUTION: Never remove the cover on a power supply or any part that has the following label attached. Hazardous voltage, current, and energy levels are present inside any component that has this label attached. There are no serviceable parts inside these components. If you suspect a problem with one of these parts, contact a service technician. Fan filler Fan error LED Fan filler 2nd power supply (PS2) 1st power supply (PS1) 3rd power supply (PS3) AC DC AC power LED (green) DC power LED (green) Handle (open) Release latch To install a hot-swap power supply, complete the following steps: 1. Read the safety information that begins on page v and "Installation guidelines" on page 21. Attention: Static electricity that is released to internal server components when the server is powered-on might cause the server to halt, which could result in the loss of data. To avoid this potential problem, always use an electrostatic-discharge wrist strap or other grounding system when working inside the server with the power on. 2. Remove the power-supply filler from the power-supply bay: a. Press the release latch on the power-supply filler handle and pull the handle to the open position. b. Pull the power-supply filler out of the bay. 3. Pull the handle on the power supply to the open position. 4. Place the power supply into the power-supply bay in the chassis and close the power-supply handle. 26 IBM System x3800 Type 8865: User's Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104

Statement
8:
CAUTION:
Never
remove
the
cover
on
a
power
supply
or
any
part
that
has
the
following
label
attached.
Hazardous
voltage,
current,
and
energy
levels
are
present
inside
any
component
that
has
this
label
attached.
There
are
no
serviceable
parts
inside
these
components.
If
you
suspect
a
problem
with
one
of
these
parts,
contact
a
service
technician.
Handle
(open)
2nd power
supply (PS2)
Fan filler
Fan filler
Release
latch
3rd power
supply (PS3)
DC power
LED (green)
AC power
LED (green)
1st power
supply (PS1)
AC
DC
Fan error
LED
To
install
a
hot-swap
power
supply,
complete
the
following
steps:
1.
Read
the
safety
information
that
begins
on
page
v
and
“Installation
guidelines”
on
page
21.
Attention:
Static
electricity
that
is
released
to
internal
server
components
when
the
server
is
powered-on
might
cause
the
server
to
halt,
which
could
result
in
the
loss
of
data.
To
avoid
this
potential
problem,
always
use
an
electrostatic-discharge
wrist
strap
or
other
grounding
system
when
working
inside
the
server
with
the
power
on.
2.
Remove
the
power-supply
filler
from
the
power-supply
bay:
a.
Press
the
release
latch
on
the
power-supply
filler
handle
and
pull
the
handle
to
the
open
position.
b.
Pull
the
power-supply
filler
out
of
the
bay.
3.
Pull
the
handle
on
the
power
supply
to
the
open
position.
4.
Place
the
power
supply
into
the
power-supply
bay
in
the
chassis
and
close
the
power-supply
handle.
26
IBM
System
x3800
Type
8865:
User’s
Guide