IBM x3800 User Guide - Page 61
Completing, installation
UPC - 000435948984
View all IBM x3800 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 61 highlights
Note: Make sure that the air baffle lies flat and within the grooves on top of the microprocessor heat sinks and microprocessor baffles and that the air baffle remains in place while you close the microprocessor tray. You might find it helpful to hold the air baffle in place with your thumbs while closing the microprocessor tray. 17. Reinstall the microprocessor tray in the server: a. Make sure that the microprocessor-tray release latch is open; then, push the microprocessor tray into the server. b. Close the tray levers and make sure that they are securely latched. c. Press the microprocessor-tray release latch down. d. Reinstall the fans and memory cards in the server. If you have other options to install or remove, do so now; otherwise, go to "Completing the installation." Completing the installation To complete the installation, complete the following steps: 1. Make sure that all internal cables are properly routed through the server and that all cable retention devices are in place. If you have installed an optional SAS backplane, make sure that the SAS signal cables have been routed through the internal cable-management arm. Top cover locking tab Top cover Front cover Cover release latch 2. If you removed the top cover, place the cover-release latch in the open (up) position. Insert the bottom tabs of the top cover into the matching slots in the server chassis. Press down on the cover-release latch to lock the cover in place. Chapter 2. Installing options 49