Image Fitness 4.0smith Machinekit English Manual - Page 9

Image Fitness 4.0smith Machinekit Manual

Page 9 highlights

11. Lay a Weight Upright (42) on the floor. Slide a 11 Weight Carriage (37) into the Weight Upright. Be sure that the Weight Carriage is oriented as shown. Slide the Weight Upright (42) onto the M10 x 80mm Carriage Bolts (8) in the Left Base (25). 42 Be sure that the Weight Upright is turned so that the slot is on the side shown. Thread an M10 Nylon Locknut (1) onto each M10 x 80mm Carriage Bolt. Do not tighten the Nylon Locknuts yet. Slot Assemble the other Weight Upright (42) in the same manner. 37 37 26 25 8 12. Attach the Left Barbell Upright (41) to the bracket on the Left Base (25) with an M10 x 65mm Bolt (7) and an M10 Nylon Locknut (1). Attach the Right Barbell Upright (38) to the bracket on the Right Base (26) with an M10 x 65mm Bolt (7) and an M-10 Nylon Locknut (1). Insert a Safety Stop (23) into each Barbell Upright (38, 41). Slide four Roller Bushings (30) onto each Barbell Rack (31). Slide a Barbell Rack into each Barbell Upright (38, 41). The Roller Bushings must be turned as shown in the Inset drawing. Be sure that the Barbell Racks are oriented as shown. Attach a Storage Tube (68) to the Right Base (26) with an M8 x 65mm Bolt (72), two M8 Washers (70), two 11mm x 13mm Spacers (69), and an M8 Nylon Locknut (71). Press a 1" Round Inner Cap (12) into the Storage Tube. Attach the other Storage Tube (68) to the Left Base (25) in the same manner. 12 31 30 /\ A 30 30 30 38 41 23 23 68 7 Bracket 25 12 68 71 70 7 0 0 Bracket 26 69 72 Beveled edge must face this"----a" direction 31 9

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22

11.
Lay
a
Weight
Upright
(42)
on
the
floor.
Slide
a
Weight
Carriage
(37)
into
the
Weight
Upright.
Be
sure
that
the
Weight
Carriage
is
oriented
as
shown.
Slide
the
Weight
Upright
(42)
onto
the
M10
x
80mm
Carriage
Bolts
(8)
in
the
Left
Base
(25).
Be
sure
that
the
Weight
Upright
is
turned
so
that
the
slot
is
on
the
side
shown.
Thread
an
M10
Nylon
Locknut
(1)
onto
each
M10
x
80mm
Carriage
Bolt.
Do
not
tighten
the
Nylon
Locknuts
yet.
Assemble
the
other
Weight
Upright
(42)
in
the
same
manner.
12.
Attach
the
Left
Barbell
Upright
(41)
to
the
bracket
on
the
Left
Base
(25)
with
an
M10
x
65mm
Bolt
(7)
and
an
M10
Nylon
Locknut
(1).
Attach
the
Right
Barbell
Upright
(38)
to
the
bracket
on
the
Right
Base
(26)
with
an
M10
x
65mm
Bolt
(7)
and
an
M
-
10
Nylon
Locknut
(1).
Insert
a
Safety
Stop
(23)
into
each
Barbell
Upright
(38,
41).
Slide
four
Roller
Bushings
(30)
onto
each
Barbell
Rack
(31).
Slide
a
Barbell
Rack
into
each
Barbell
Upright
(38,
41).
The
Roller
Bushings
must
be
turned
as
shown
in
the
Inset
drawing.
Be
sure
that
the
Barbell
Racks
are
oriented
as
shown.
Attach
a
Storage
Tube
(68)
to
the
Right
Base
(26)
with
an
M8
x
65mm
Bolt
(72),
two
M8
Washers
(70),
two
11mm
x
13mm
Spacers
(69),
and
an
M8
Nylon
Locknut
(71).
Press
a
1"
Round
Inner
Cap
(12)
into
the
Storage
Tube.
Attach
the
other
Storage
Tube
(68)
to
the
Left
Base
(25)
in
the
same
manner.
11
Slot
25
37
8
42
26
37
12
31
30
/\
A
30
30
30
7
Bracket
41
23
68
25
71
0
12
68
70
0
69
72
38
23
7
Bracket
26
Beveled
edge
must
face
this
"
----
a"
direction
31
9