Installation Check Off List

Page 24 highlights

INSTALLATION CHECK OFF LIST This Slide Gate operator is installed for use in a Class _____ installation. Each item on this installation check off list should be verified by the installer. _____ Two warning signs securely installed on each side of gate panel (required). _____ 1 or 2 safety photo beams installed, one across each side of gate opening (required). _____ 1 or 2 stop photo beams installed on each side of fixed gate panel (required). _____ Customer advised that gate in for vehicular traffic only (required). _____ A separate pedestrian entry and/or exit is provided (required). _____ Contact edges installed and functional at all hazard or pinch points. _____ Safety guards installed covering all cantilever wheels (required). _____ All controls located far out of reach of gate, fixed panel and operator (required). _____ This class operator is approved for the application of the operator (1, 2, 3 or 4) (required). _____ A sphere with a 2-1/4" diameter cannot be pushed through the gate or fixed panel. _____ A safety screen/mesh is installed with a minimum height of 4' from ground. _____ Controls intended to reset gate after obstructed installed in line of sight (required). _____ Hard wired contact sensors located and wired to avoid any mechanical damage. _____ Customer instructed and is clear on proper use of gate operator (required). _____ Customer instructed on proper use of all control devices used with operator. _____ Safety instructions were reviewed and left with customer (required). _____ Installer offered a preventative service/maintenance contract. _____ A photo of completed installation taken from front and back of gate and dated. _____ Gate conforms to the recommended ASTM F 2200-02 requirements. Customer's Signature Date Installer's Signature Date Customer and installer should retain a copy of this check off list for their records. 01-60177D © 2008, The Chamberlain Group, Inc. All Rights Reserved

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24

© 2008, The Chamberlain Group, Inc.
01-60177D
All Rights Reserved
INSTALLATION CHECK OFF LIST
This Slide Gate operator is installed for use in a Class _____ installation.
Each item on this installation check off list should be verified by the installer.
_____ Two warning signs securely installed on each side of gate panel (required).
_____ 1 or 2 safety photo beams installed, one across each side of gate opening (required).
_____ 1 or 2 stop photo beams installed on each side of fixed gate panel (required).
_____ Customer advised that gate in for vehicular traffic only (required).
_____ A separate pedestrian entry and/or exit is provided (required).
_____ Contact edges installed and functional at all hazard or pinch points.
_____ Safety guards installed covering all cantilever wheels (required).
_____ All controls located far out of reach of gate, fixed panel and operator (required).
_____ This class operator is approved for the application of the operator (1, 2, 3 or 4) (required).
_____ A sphere with a 2-1/4" diameter cannot be pushed through the gate or fixed panel.
_____ A safety screen/mesh is installed with a minimum height of 4' from ground.
_____ Controls intended to reset gate after obstructed installed in line of sight (required).
_____ Hard wired contact sensors located and wired to avoid any mechanical damage.
_____ Customer instructed and is clear on proper use of gate operator (required).
_____ Customer instructed on proper use of all control devices used with operator.
_____ Safety instructions were reviewed and left with customer (required).
_____ Installer offered a preventative service/maintenance contract.
_____ A photo of completed installation taken from front and back of gate and dated.
_____ Gate conforms to the recommended ASTM F 2200-02 requirements.
Customer's Signature
Date
Installer's Signature
Date
Customer and installer should retain a copy of this check off list for their records.