Maytag MFI2266AEW Use and Care Guide - Page 10

Opening and Closing Your, Fresh Food Doors

Page 10 highlights

Installation Materials Needed: • '/4" outer diameter flexible copper tubing • Shut-off valve (requires a '/4" hole to be drilled into water supply line before valve attachment) • Adjustable wrenches (2) • '/_" hex nut driver Notes: • Use copper tubing only for installation. Plastic is less durable and can cause damage. • Add 8' to tubing length needed to reach water supply for creation of service loop. . Create service loop with copper tubing (minimum 2' diameter). Avoid kinks in the copper tubing when bending it into a service loop. Do not use plastic tubing. 2' diameter minimum 2. Remove plastic cap from water supply connection. . Pull on tubing to confirm connection is secure. Connect tubing to frame with water tubing clamp 1:0). Slide waterline into retainer, then turn on water supply. Check for leaks and correct if necessary. Continue to observe the water supply connection for two to three hours prior to moving the refrigerator permanent location. to its 7. Monitor water connection for 24 hours. Correct leaks, if necessary. Opening and Closing Your Fresh Food Doors Your new refrigerator is uniquely designed with two fresh food doors. Either door can be opened or closed independently of one another. . Place brass nut 1:A) and sleeve 1:B) on copper tube end as illustrated. Reminder: De net use an old sleeve. The nut and sleeve are provided in the Use and Care packet. . Place end of copper tubing into water valve supply line. . Slide brass nut over sleeve and screw nut into supply line. For proper usage and to avoid possible damage, A always ensure the vertical hinged section (on the left B fresh food door) remains folded inward before closing both doors. When both doors are closed, the hinged section automatically forms a seal between the two doors. When the left door is opened, the vertical hinged section automatically folds inward so that is is out of the way. 2 I:1) Place adjustable wrench on nut attached 1 to plastic waterline and maintain position. tie 1:2) Using second adjustable wrench turn the upper nut clockwise and fully tighten while holding the lower nut in place. Important: Do not over-tighten. Cross threading may Occur. 9

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96

Installation
Materials
Needed:
• '/4" outer diameter
flexible
copper
tubing
• Shut-off
valve (requires
a '/4" hole to be drilled
into
water
supply
line
before
valve attachment)
• Adjustable
wrenches
(2)
• '/_" hex nut driver
Notes:
Use copper
tubing
only for installation.
Plastic
is
less durable
and can cause damage.
• Add
8' to tubing
length
needed
to reach water
supply
for
creation
of service
loop.
.
Create
service
loop with
copper
tubing
(minimum
2'
diameter).
Avoid
kinks
in
the copper
tubing
when
bending
it into a service
loop.
Do not
use plastic
tubing.
2' diameter
minimum
2. Remove
plastic
cap from water
supply
connection.
.
Place brass nut 1:A) and sleeve 1:B)
on copper
tube end as illustrated.
Reminder:
De
net
use an old sleeve.
The nut and sleeve
are provided
in
the Use and Care packet.
A
B
.
.
Place end of copper
tubing
into water
valve
supply
line.
Slide brass nut over
sleeve and screw
nut
into supply
line.
I:1) Place adjustable
wrench
on nut attached
to plastic
waterline
and
maintain
position.
1:2) Using
second
adjustable
wrench
turn
the upper
nut
clockwise
and fully tighten
while
holding
the lower
nut in
place.
Important:
Do not
over-tighten.
Cross threading
may
Occur.
2
1
tie
.
Pull on tubing
to confirm
connection
is secure. Connect
tubing
to frame with
water
tubing
clamp
1:0). Slide
waterline
into retainer,
then
turn
on water
supply. Check
for leaks and correct
if
necessary.
Continue
to
observe
the water
supply
connection
for two to three
hours prior
to moving
the refrigerator
to its
permanent
location.
7. Monitor
water
connection
for 24 hours.
Correct
leaks, if necessary.
Opening and Closing Your
Fresh Food Doors
Your new
refrigerator
is
uniquely
designed
with
two
fresh
food doors.
Either door
can be opened
or closed
independently
of one another.
For proper
usage and to
avoid possible
damage,
always
ensure the vertical
hinged
section
(on the left
fresh
food door)
remains
folded
inward
before
closing
both doors. When
both doors
are closed, the hinged
section
automatically
forms
a seal between
the two doors.
When the left door
is opened,
the vertical
hinged
section
automatically
folds
inward
so that
is is out of
the way.
9