Netgear GS110TP-100NAS GS110TP Hardware Installation Guide - Page 17
Installation, Step 1: Preparing the Site
View all Netgear GS110TP-100NAS manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 17 highlights
Chapter 4 Installation This chapter describes the installation procedures for your NETGEAR GS110TP Smart PoE Switch. Switch installation involves the following steps: Step 1: Preparing the Site Step 2: Installing the Switch Step 3: Checking the Installation Step 4: Connecting Devices to the Switch Step 5: Applying AC Power Step 6: Managing the Switch using a Web Browser or the PC Utility Step 1: Preparing the Site Before you install the switch, ensure the operating environment meets the site requirements in the following table. Table 4-1. Site Requirements Characteristics Requirements Mounting Access • Desktop installations - Provide a flat table or shelf surface. • Wall-mount installations - Wall-mount: select a location. You also need the mounting screws supplied with your switch. Locate the switch in a position that allows access to the front panel RJ-45 ports, view the front panel LEDs, and access the power connector. 4-1 v1.0, March 2010