Netgear GS510TPP Hardware Installation Guide - Page 16

Step 3: Unpack the Switch, To check the package contents, Installation

Page 16 highlights

ProSAFE 8-Port Gigabit Smart Managed Switch with PoE+ and 2 SFP Ports • When unpacking a static-sensitive component from its shipping carton, leave it in the antistatic package until you are ready to install it. Just before unwrapping the antistatic package, discharge static electricity from your body. • Before moving a sensitive component, place it in an antistatic container or package. • Handle all sensitive components in a static-safe area. If possible, use antistatic floor pads, workbench pads, and an antistatic grounding strap. Step 3: Unpack the Switch The following figure shows the package contents for the GS510TLP.The package contents for the GS510TPP are the same. Figure 5. Switch package contents Check the contents of the boxes to make sure that all items are present before installing the switch. To check the package contents: 1. Place the container on a clean flat surface, and cut all straps securing the container. 2. Unpack the hardware from the boxes by carefully removing the hardware and placing it on a secure and clean surface. 3. Remove all packing material. 4. Verify that the package contains the following items: a. Switch of the correct model b. Power cord Installation 16

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27

When unpacking a static-sensitive component from its shipping carton, leave it in the antistatic package
until you are ready to install it. Just before unwrapping the antistatic package, discharge static electricity
from your body.
Before moving a sensitive component, place it in an antistatic container or package.
Handle all sensitive components in a static-safe area. If possible, use antistatic floor pads, workbench
pads, and an antistatic grounding strap.
Step 3: Unpack the Switch
The following figure shows the package contents for the GS510TLP.The package contents for the GS510TPP
are the same.
Figure 5. Switch package contents
Check the contents of the boxes to make sure that all items are present before installing the switch.
To check the package contents:
1.
Place the container on a clean flat surface, and cut all straps securing the container.
2.
Unpack the hardware from the boxes by carefully removing the hardware and placing it on a secure
and clean surface.
3.
Remove all packing material.
4.
Verify that the package contains the following items:
a.
Switch of the correct model
b.
Power cord
Installation
16
ProSAFE 8-Port Gigabit Smart Managed Switch with PoE+ and 2 SFP Ports