Netgear GS716Tv2 GS716Tv2/GS724Tv3 Hardware manual - Page 19

Step 3: Checking the Installation

Page 19 highlights

GS716T/GS724T Hardware Installation Guide 5. Tighten the screws with a #2 Phillips screwdriver to secure the switch in the rack. Figure 4-1 Step 3: Checking the Installation Before applying power perform the following: • Inspect the equipment thoroughly. • Verify that all cables are installed correctly. • Check cable routing to make sure cables are not damaged or creating a safety hazard. • Ensure all equipment is mounted properly and securely. Installation v1.0, June 2009 4-15

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31

GS716T/GS724T Hardware Installation Guide
Installation
4-15
v1.0, June 2009
5.
Tighten the screws with a #2 Phillips screwdriver to secure the switch in the rack.
Step 3: Checking the Installation
Before applying power perform the following:
Inspect the equipment thoroughly.
Verify that all cables are installed correctly.
Check cable routing to make sure cables are not damaged or creating a safety hazard.
Ensure all equipment is mounted properly and securely.
Figure 4-1