NordicTrack Grt470 English Manual - Page 13
end of the Weight Cable 72. Place the Long Weight
View all NordicTrack Grt470 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 13 highlights
24. Identify the Weight Cable (72). It is approximately 24 118 1/4Ó long and it has a closed loop on one end and a bolt on the other. Thread the 1/2Ó Plain Nut (100) onto the bolt at the end of the Weight Cable (72). Place the Long Weight 72 Spacer (96) over the Weight Tube (17) and place the 1/2Ó Flat Washer (98) on top of the Long Weight Spacer. Thread the bolt at the end of the Weight Cable into the Weight Tube. Note: The bolt at the end of the Weight Cable is one of the means for tightening the Cables (72, 73, 74, and 75). When you have mounted all Cables, use the following procedure for tightening the Cables: Thread the bolt into the Weight Tube (17) until all Cables are tight and rest firmly in the grooves of all Pulleys. Then tighten the 1/2Ó Plain Nut (100) onto the 1/2Ó Washer (98). 100 98 96 17 25. Route the Weight Cable (72) through the opening 25 between the Weight Guides (15) as shown and then through the slot in the Weight Upright (9). Route the Weight Cable (72) over a 3 1/2Ó Pulley (24) as shown. Attach the 3 1/2Ó Pulley inside the slot in the Weight Upright (9) with a 3/8Ó x 2 3/4Ó Bolt (46), two 3/8Ó Flat Washers (48), two 5/8Ó x 1/2Ó Spacers (102) and a 3/8Ó Nylon Locknut (50). 50 9 48 102 24 102 Slot 48 46 72 15 13