Pyle PDMT08 PDMT08 Manual 1 - Page 19

it securely.

Page 19 highlights

4. Install the new fuse into the holder. 5. Always use a fuse of the proper size and value (0.5A/250V fast blow for the 200mA range, 10A/250V fast blow for the 10A range). 6. Put the fuse door back in place. Insert the screw and tighten it securely. WARNING: To avoid electric shock, do not operate your meter until the fuse door is in place and fastened securely. 19

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19

19
4.
Install the new fuse into the holder.
5.
Always use a fuse of the proper size and value (0.5A/250V
fast blow for the 200mA range, 10A/250V fast blow for the
10A range).
6.
Put the fuse door back in place. Insert the screw and tighten
it securely.
WARNING
: To avoid electric shock, do not operate your meter until
the fuse door is in place and fastened securely.