Samsung DA-E750 User Manual Ver.1.0 (English) - Page 11

connections - release

Page 11 highlights

ENG connections instaLLing the tOrOiDaL ferrite On the POWer caBLe Lift up to release the lock and open the core. ● CONNECTIONS Close the lock back. Wind Power cable around the core three times. (Start winding at 2-4 inches away from the plugs) instaLLing the ferrite cOre On the Lan caBLe Lift up to release the lock and open the core. Close the lock back. Place the LAN cable on the opened core. 11

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35

11
ENG
CONNECTIONS
connections
INSTALLING THE TOROIDAL FERRITE ON THE POWER CABLE
Wind Power cable around the core three times.
(Start winding at 2-4 inches away from the plugs)
Close the lock back.
Lift up to release the lock and open the core.
INSTALLING THE FERRITE CORE ON THE LAN CABLE
Place the LAN cable on the opened core.
Close the lock back.
Lift up to release the lock and open the core.