Weider 2980 X Canadian English Manual - Page 13

Attach the Pulley and two Half Guards 43

Page 13 highlights

18. Route the Low Cable (53) under a 90mm Pulley (48) and through the Upright (3). Attach the 18 Pulley inside the Upright with an M10 x 67mm Bolt (71), two M10 Washers (57), two 12mm Spacers (52), and an M10 Nylon Locknut (56). 56 52 57 48 53 3 52 71 57 19. Route the Low Cable (53) over a 90mm Pulley (48). Attach the Pulley and two Half Guards (43) 19 to the Double U-bracket (63) with an M10 x 46mm Bolt (81) and an M10 Nylon Locknut (56). Make sure that the Half Guards are on the outside of the U-bracket as shown. 56 43 48 63 43 53 81 20. Route the Low Cable (53) under a 90mm Pulley 20 (48). Attach the Pulley and two Half Guards (43) to the Base (1) with an M10 x 46mm Bolt (81) and an M10 Nylon Locknut (56). Make sure that the Half Guards are on the outside of the bracket as shown. 56 43 53 48 81 1 43 13

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28

13
18. Route the Low Cable (53) under a 90mm Pulley
(48) and through the Upright (3). Attach the
Pulley inside the Upright with an M10 x 67mm
Bolt (71), two M10 Washers (57), two 12mm
Spacers (52), and an M10 Nylon Locknut (56).
19. Route the Low Cable (53) over a 90mm Pulley
(48). Attach the Pulley and two Half Guards (43)
to the Double U-bracket (63) with an M10 x
46mm Bolt (81) and an M10 Nylon Locknut
(56).
Make sure that the Half Guards are on
the outside of the U-bracket as shown.
53
43
19
56
3
53
52
52
57
57
48
71
18
20. Route the Low Cable (53) under a 90mm Pulley
(48). Attach the Pulley and two Half Guards (43)
to the Base (1) with an M10 x 46mm Bolt (81)
and an M10 Nylon Locknut (56).
Make sure
that the Half Guards are on the outside of
the bracket as shown.
53
43
1
43
81
56
48
20
63
43
81
48
56