Weider 9150 Uk Manual - Page 9

Cable Assembly

Page 9 highlights

9. Press a 50mm Square Inner Cap (44) into the 9 end of the Right Butterfly Arm (48). Press a Sleeve (89) into the Right Butterfly Arm. Wet the lower end of the Right Butterfly Arm (48) with soapy water. Slide a Large Foam Pad (45) onto the Right Butterfly Arm. Repeat this step with the Left Butterfly Arm (47). 10. Lubricate the axles on the Top Frame (55). Orient 10 the Right Butterfly Arm (48) as shown and slide it onto the right axle. Be sure the Butterfly Arm is behind the bracket on the Top Frame. Have a second person secure the Right Butterfly Arm (48) to the axle with two 25mm Retainers (68) and a 25mm Cover Cap (65). Note: Place the Retainers on top of the inverted Cover Cap, as shown in the inset drawing. Make sure the teeth on the Retainers bend toward the Cover Cap. Gently tap the Cover Cap onto the axle. Repeat this step with the Left Butterfly Arm (47). 89 47 48 45 44 45 44 55 Bracket 47 Lubricate Axle 48 68 65 Cable Assembly 11 11. For cable identification and routing during steps 11 to 25, refer to the CABLE DIAGRAMS on page 20. Do not overtighten the bolts and locknuts that secure the pulleys; the pulleys must be able to rotate freely. Locate the High Cable (23), which has a ball on one end and a bolt on the other. Route the bolt end of the Cable up through the Top Frame (55) and around a "V"-Pulley (6). Attach the Pulley inside the Top Frame with an M10 x 75mm Bolt (76), two 12.5mm Spacers (82), two M10 Washers (9), and an M10 Nylon Locknut (21). 9 Axle 68 65 23 6 55 76 82 9 82 21 9

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30

9
9.
Press a 50mm Square Inner Cap (44) into the
end of the Right Butterfly Arm (48). Press a
Sleeve (89) into the Right Butterfly Arm.
Wet the lower end of the Right Butterfly Arm (48)
with soapy water. Slide a Large Foam Pad (45)
onto the Right Butterfly Arm.
Repeat this step with the Left Butterfly Arm
(47).
9
47
45
44
48
89
45
44
10. Lubricate the axles on the Top Frame (55). Orient
the Right Butterfly Arm (48) as shown and slide it
onto the right axle.
Be sure the Butterfly Arm is
behind the bracket on the Top Frame.
Have a second person secure the Right Butterfly
Arm (48) to the axle with two 25mm Retainers
(68) and a 25mm Cover Cap (65).
Note: Place
the Retainers on top of the inverted Cover
Cap, as shown in the inset drawing. Make
sure the teeth on the Retainers bend toward
the Cover Cap. Gently tap the Cover Cap onto
the axle.
Repeat this step with the Left Butterfly Arm
(47).
10
47
Lubricate
Axle
Bracket
65
65
48
55
68
68
Axle
Cable Assembly
11.
For cable identification and routing during
steps 11 to 25, refer to the CABLE DIAGRAMS
on page 20. Do not overtighten the bolts and
locknuts that secure the pulleys; the pulleys
must be able to rotate freely.
Locate the High Cable (23),
which has a ball on
one end and a bolt on the other. Route the bolt
end of the Cable up through the Top Frame (55)
and around a ā€œVā€-Pulley (6). Attach the Pulley
inside the Top Frame with an M10 x 75mm Bolt
(76), two 12.5mm Spacers (82), two M10
Washers (9), and an M10 Nylon Locknut (21).
6
23
11
55
21
76
9
9
82
82