Weider Cjxt3 Master Trainer User Manual - Page 5
completed.
View all Weider Cjxt3 Master Trainer manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 5 highlights
3. Press the 1 1/4" Inner Cap (57) into the Front 3 Upright (42). Attach the 1" Plastic Stop (64) to the center hole in the Stop Bracket (63) with a 5/16" x 1 1/2" Bolt (24) and 5/16" Nylon Locknut (3). Attach the Stop Bracket (63) to the Front Upright (42) with a 5/16" x 2" Bolt (61), a 5/16" Flat Washer (8) and a 5/16" Nylon Locknut (3). Slide the Front Upright (42) onto the two 5/16" x 2 1/2" Carriage Bolts (1) in the Base (4). Attach the Front Upright to the Base with two 5/16" Nylon Locknuts (3). Do not tighten the Nylon Locknuts yet. 63 Single Hole 3 3 24 57 6 42 4 3 4. Press two 2" Inner Caps (27) into the Top Frame (67). Attach the Top Frame (67) to the Front Upright (42) with two 5/16" x 2 3/4" Bolts (11). 5/16" Flat Washers (8) and 5/16" Nylon Locknuts (3). Do not tighten the Nylon Locknuts yet. Attach the Top Frame (67) to the Stop Bracket (63) with a 5/16" x 2 3/4" Bolt (11), 5/16" Rat Washer (8) and 5/16" Nylon Locknut (3). Do not tighten the Nylon Locknut yet. Attach the Top Frame (67) to the Rear Upright (82) with two 5/16" x 2 3/4" Bolts (11), 5/16" Flat Washers (8) and 5/16" Nylon Locknuts (3). lighten all Nuts used in steps 2 through 4. 5. Set the two Weight Bumpers (19) on the indicated plate on the Base (4). Align the holes in the Weight Bumpers with the holes in the plate. Stack nine Weights (25) on the Weight Bumpers (19). Each Weight must be turned so the "welder" logo is on top, and the pin groove is facing the Front Upright (42). The holes In the Weights must be aligned with the holes in the Weight Bumpers. CAUTION: Be careful to avoid Upping the stack of Weights until step 6 Is completed. A 11 8 27 3 82 5 11 11 8 67 3 27 3 63 42 25 0 `Weider" Logo on Top Pin Groove 9 42 19 4