Weider Pro 9940 English Manual - Page 12

Small Pulley Bracket 22 with a 3/8 x 1 3/4 Bolt - assembly

Page 12 highlights

21. Remove both 3 1/2" Pulleys (24) from the pre-assem- 21 bled Small Pulley Bracket (22). Wrap the Butterfly Cable (73) around a 3 1/2" Pulley (24) in the direction shown. Attach the Pulley to the Small Pulley Bracket (22) with a 3/8" x 1 3/4" Bolt (57) and a 3/8" Nylon Locknut (50). Make sure the Small Pulley Bracket is oriented exactly as shown. 57 22. Wrap the Butterfly Cable (73) around a "V"-Pulley (27) in the direction shown. Attach the "V"-Pulley and a Large Cable Trap (32) to the bracket on the back of the Butterfly Upright (1) with a 3/8" x 2 1/2" Bolt (53) and a 3/8" Nylon Locknut (50). Make sure the Large Cable Trap is oriented as shown. 22 53 27 73 32 73 24 50 22 Bracket 50 23. Attach the Butterfly Cable (73) to the bracket on the 23 Right Butterfly Arm (11) with a 3/8" x 1" Bolt (84) and two 3/8" Nylon Jamnuts (63). Note: The loop on the Cable and the two Nylon Jamnuts must be mount- ed underneath the welded bracket. 11 1 84 Bracket 63 73 24. Identify the Ab Cable (74). It is approximately 224" 24 long, and it has a ball on one end and a threaded shaft on the other. You will start by attaching the end of the Cable with the ball. 59 48 Wrap the Ab Cable (74) around a 3 1/2" Pulley (24) in the direction shown. Place two Pulley Covers (47) over the Pulley, so that the slots in the Pulley Covers are placed over the Cable. Attach the Pulley and Pulley Covers to the indicated hole in the Butterfly Upright (1) with a 3/8" x 3 3/4" Bolt (59), two 3/8" Flat Washers (48), and a 3/8" Nylon Jamnut (63). Make sure the Cable is between the Pulley and the welded pin on the Upright. 47 Pin 74 24 63 48 1 12

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32

12
23. Attach the Butterfly Cable (73) to the bracket on the
Right Butterfly Arm (11) with a 3/8” x 1” Bolt (84) and
two 3/8” Nylon Jamnuts (63).
Note: The loop on the
Cable and the two Nylon Jamnuts must be mount-
ed underneath the welded bracket.
23
84
11
63
73
Bracket
24. Identify the Ab Cable (74). It is approximately 224”
long, and it has a ball on one end and a threaded
shaft on the other. You will start by attaching the end
of the Cable with the ball.
Wrap the Ab Cable (74) around a 3 1/2” Pulley (24) in
the direction shown. Place two Pulley Covers (47)
over the Pulley, so that the slots in the Pulley Covers
are placed over the Cable. Attach the Pulley and
Pulley Covers to the indicated hole in the Butterfly
Upright (1) with a 3/8” x 3 3/4” Bolt (59), two 3/8” Flat
Washers (48), and a 3/8” Nylon Jamnut (63).
Make
sure the Cable is between the Pulley and the
welded pin on the Upright.
24
1
74
24
48
63
48
59
47
22. Wrap the Butterfly Cable (73) around a “V”-Pulley
(27) in the direction shown. Attach the “V”-Pulley and
a Large Cable Trap (32) to the bracket
on the back
of the Butterfly Upright (1)
with a 3/8” x 2 1/2” Bolt
(53) and a 3/8” Nylon Locknut (50).
Make sure the
Large Cable Trap is oriented as shown.
22
53
27
73
Bracket
50
1
21. Remove both 3 1/2” Pulleys (24) from the pre-assem-
bled Small Pulley Bracket (22).
Wrap the Butterfly Cable (73) around a 3 1/2” Pulley
(24) in the direction shown. Attach the Pulley to the
Small Pulley Bracket (22) with a 3/8” x 1 3/4” Bolt
(57) and a 3/8” Nylon Locknut (50).
Make sure the
Small Pulley Bracket is oriented exactly as
shown.
21
73
50
24
57
22
Pin
32