Acer AT350 F2 Acer AT350 F2 Server Service Guide - Page 137

supply circuit to the system to avoid any circuit overload. The system

Page 137 highlights

123 • Mechanical loading Exercise care when mounting the system in a rack to avoid any accidents. • Circuit overloading Appropriate consideration should be given when connecting the supply circuit to the system to avoid any circuit overload. The system name plate rating should be used when addressing concerns about circuit overload.

We apologize, but we cannot currently deliver this PDF manual by request of the manufacturer.

We apologize for any inconveniece.