Acer AT350 F2 Acer AT350 F2 Server Service Guide - Page 41

Post-installation instructions, cables that have previously been removed.

Page 41 highlights

27 5 Open the server according to the instructions on page 41. 6 Follow the ESD precautions described in the previous section when handling a server component. Post-installation instructions Perform the steps below after installing a server component. 1 See to it that all components are installed according to the described step-by-step instructions. 2 Reinstall any expansion board(s), peripheral(s), bracket(s) and system cable(s) that have previously been removed. 3 Reinstall the side panel. 4 Reconnect the power, peripheral, and telecommunication cables. 5 Turn on the system.

We apologize, but we cannot currently deliver this PDF manual by request of the manufacturer.

We apologize for any inconveniece.