Acer AT350 F2 Acer AT350 F2 Server Service Guide - Page 142

Align the left and right mounting rails to the rear rack post

Page 142 highlights

128 Appendix B Rack mount configuration 4 Install the mounting rails to the rack posts. (1) Align the left and right mounting rails to the front rack post mounting holes. Secure each mounting rail to the front rack post with one screw. (2) Align the left and right mounting rails to the rear rack post mounting holes. Secure each mounting rail to the rear rack post with two screws.

We apologize, but we cannot currently deliver this PDF manual by request of the manufacturer.

We apologize for any inconveniece.