Brother International BES-1240BC Instruction Manual - English - Page 244
Adjustment of Timing Between Needle and Rotary Hook
View all Brother International BES-1240BC manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 244 highlights
Chapter 10 Standard Adjustment 4. Adjustment of Timing Between Needle and Rotary Hook 1. Turn the power switch on. 2. Check that the machine pulley is at the stop position (at 100˚ of the scale). If not, turn the pulley until it comes to the stop position. 3. While the machine is at the stop position, press the JOG switch ( ) while holding down the STOP switch. "AJST" is indicated on the display. STOP 4. Pressing the START switch. "STEP" is indicated. The rotary hook in each machine head rotates to the currently set timing position and the rotary hook can be adjusted. 140° 150 200 Rotary hook's point START 5. Turn the machine pulley manually until the relationship between the needle point and the rotary hook's point can be easily checked (at around 140° of the scale). 6. Press the STEP BACK/FWD switch to move the rotary hook for each head to adjustment. • STEP BACK For rotating the rotary hook little by little in the clockwise direction • STEP FWD For rotating the rotary hook little by little in the counterclockwise direction Make this adjustment for each machine head so that the needle and the rotary hook's point can fit with each other. 242 BES-940BC • BES-1240BC