Cisco SR224 User Guide - Page 16
Uplinking the Switch, Rack-Mount Placement
UPC - 745883556526
View all Cisco SR224 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 16 highlights
24-port 10/100 + 2-Port Gigabit Switch with WebView Rack-Mount Placement To rack-mount the Switch in any standard 19-inch rack, follow the instructions described below. 1. Place the Switch on a hard flat surface with the front panel faced towards your front side 2. Attach a rack-mount bracket to one side of the Switch with the supplied screws. Figure 3-2 shows how to attach brackets to one side of the Switch. 3. Secure the brackets tightly. 4. Follow the same steps to attach the other bracket to the opposite side. 5. After the brackets are attached to the Switch, use suitable screws to securely attach the brackets to any standard 19-inch rack as shown in Figure 3-3. 6. Connect the Switch to network devices according to the Hardware Installation instructions. Uplinking the Switch To uplink the Switch, connect one end of a Cat5 (or better) cable into one of the 24 10/100 ports, and then connect the other end of the cable into the peripheral device's uplink port. MDI/MDIX will automaticlaly detect the speed and cable type. Figure 3-4: Mounting the Switch in A Rack The hardware installation is complete,. Proceed to Chapter 4: Setting Up the 24-port 10/100 + 2-Port Gigabit Switch with WebView, for directions on how to set up the Switch. Chapter 3: Connecting the Switch 10 Uplinking the Switch