EVGA 123-YW-E175-A1 User Manual - Page 14
Hardware Installation
UPC - 843368004507
View all EVGA 123-YW-E175-A1 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 14 highlights
EVGA Hardware Installation This section will guide you through the installation of the motherboard. The topics covered in this section are: Preparing the motherboard Installing the CPU Installing the CPU fan Installing the memory Installing the motherboard Connecting cables and setting switches Safety Instructions To reduce the risk of fire, electric shock, and injury, always follows basic safety precautions. Remember to remove power from your computer by disconnecting the AC main source before removing or installing any equipment from/to the computer chassis. Preparing the Motherboard The motherboard shipped in the box does not contain a CPU or memory. You need to purchase these components to complete this installation. 7
EVGA
7
Hardware Installation
This section will guide you through the installation of the motherboard.
The topics covered in this section are:
Preparing the motherboard
Installing the CPU
Installing the CPU fan
Installing the memory
Installing the motherboard
Connecting cables and setting switches
Safety Instructions
To reduce the risk of fire, electric shock, and injury, always follows basic safety precautions.
Remember to remove power from your computer by disconnecting the AC main source before re-
moving or installing any equipment from/to the computer chassis.
Preparing the Motherboard
The motherboard shipped in the box does not contain a CPU or memory. You need to purchase
these
components
to complete this installation.