GE GFDS140GDWW Owners Manual - Page 20

Kit Contents Optional Kit Ge Fl Stack, Tools You Will Need, Installation Preparation

Page 20 highlights

Stacking. KIT CONTENTS (optional kit GE FL STACK) Right Hand Bracket 4 Rubber Pads Left Hand Bracket TOOLS YOU WILL NEED 4 #12 x 1" Screws 4 #8 x 1/2" Screws Phillips Screwdriver Pliers Open-Ended Wrench INSTALLATION PREPARATION Remove the packaging. Flatten the product carton to use as a pad to lay the dryer down on its side. Continue using the carton to protect the finished floor in front of the installation location. Gloves Level 20

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60

20
Stacking.
KIT CONTENTS (optional kit GE FL STACK)
Right Hand Bracket
Left Hand Bracket
4 Rubber Pads
4 #12 x 1” Screws
4 #8 x 1/2” Screws
TOOLS YOU WILL NEED
Phillips Screwdriver
Open-Ended Wrench
Pliers
Gloves
Level
INSTALLATION PREPARATION
Remove the packaging.
Flatten the product carton to use as a pad
to lay the dryer down on its side. Continue using the
carton to protect the finished floor in front of the
installation location.