GE JS900 Installation Instructions - Page 5
Pre-Installation Cutout, and Required Clearances
View all GE JS900 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 5 highlights
Installation Instructions 1 Pre-Installation Cutout and Required Clearances If cabinets are placed less than 30" above the range, see Alternate Construction, section AF, on page 16. 30" ranges conform to U.L. requirements for 0" spacing from vertical walls below countertops. Allow 1/4" minimum clearance at the back wall above the countertop. Wall coverings, counters and cabinets around range must withstand heat (up to 194°F) generated by the range. 5
5
Installation Instructions
Pre-Installation Cutout
and Required Clearances
1
If cabinets are placed less than 30
”
above the
range, see Alternate Construction, section AF,
on page 16.
30
”
ranges conform to U.L. requirements
for 0
”
spacing from vertical walls below
countertops. Allow 1/4
”
minimum clearance
at the back wall above the countertop.
Wall coverings, counters and cabinets around
range must withstand heat (up to 194
°
F)
generated by the range.