Close and lock both doors., Place the plastic bag over the rack and tape the keys to the front

Page 40 highlights

7. Close and lock both doors. Figure 26. Closing the rack doors NOTE Before locking the rack doors, all servers and other equipment should be installed in the rack. Only equipment certified to ship in the 10000 Series Racks should be installed at this time. Equipment not yet certified to ship in the 10000 Series Racks should be installed on-site at the final destination to prevent damage to equipment while the rack is in transit. 8. Place the plastic bag over the rack and tape the keys to the front of the bag. Figure 27. Placing the paper bag over the rack 38

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48

38
7.
Close and lock both doors.
Figure 26.
Closing the rack doors
NOTE
Before locking the rack doors, all servers and other equipment should be
installed in the rack. Only equipment certified to ship in the 10000 Series
Racks should be installed at this time. Equipment not yet certified to ship in
the 10000 Series Racks should be installed on-site at the final destination to
prevent damage to equipment while the rack is in transit.
8.
Place the plastic bag over the rack and tape the keys to the front of the bag.
Figure 27.
Placing the paper bag over the rack