HP StorageWorks 2/32 SAN switch universal rack mount kit installation addendum - Page 12
Assembling the inner rails on a SAN Switch 2/8 with plenum, For the SAN Switch 2/8
View all HP StorageWorks 2/32 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 12 highlights
Installing the Switch in a Rack Using the SAN Switch Universal Rack Mount Kit b. For the SAN Switch 2/8, assemble the two inner rails (one on each side) to the switch and plenum using the appropriate number (from step 5) of #8-32 x 3/16-inch Phillips pan-head screws as shown in Figure 8. Note: The plenum is only a required part of this installation when the SAN Switch 2/8 is installed in the HP System/e rack. The plenum is not needed if the switch is installed in an HP 9000 Series or comparable EIA rack. Verify that the plenum (part number A7346-00001) is preinstalled on the SAN Switch 2/8 before proceeding. The plenum is required for the SAN Switch 2/8 rack mount only, as it allows air to dissipate at the rear of the rack, preventing overheating. If the plenum is not preinstalled on the SAN Switch 2/8, refer to the HP StorageWorks SAN Switch 2/8 Version 3.1.x Installation Guide for complete plenum installation instructions. Figure 8: Assembling the inner rails on a SAN Switch 2/8 with plenum 10 Addendum Pg HP StorageWorks SAN Switch 2/8|16|32 Installation Guide