Table 1-1, Site Preparation Technical Tasks

Page 10 highlights

Table 1-1 Introduction Hewlett-Packard Service Organization Site Preparation Technical Tasks Technical Tasks Responsible Personnel Line voltage measured Electrician and Customer Engineer (CE) Power line frequency measured (if required) CE Power line noise levels measured (if required) CE Neutral or ground noise/voltage levels measured CE Safety and ground connections verified Electrician and CE Advice on correct circuit breakers and wire size Electrician and CE Verification that maintenance power outlets (those used for floor cleaning, etc.) are on separate circuits from the computer system Electrician and CE Recommendations about lightning protection CE Measurements and recommendations on CE radiated interference Answers to questions concerning modems and modem options Applications Engineer (AE) Thermal load of HP equipment CE Thermal load of non-HP equipment Customer and Equipment Vendor Modifications to existing electrical service Electrician and Customer Modifications to existing air conditioning A/C Contractor and Customer Environmental contaminants CE and Environmental Engineer/Contractor Placement of equipment (for service access) CE 6 Chapter 1

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48

6
Chapter 1
Introduction
Hewlett-Packard Service Organization
Table 1-1
Site Preparation Technical Tasks
Technical Tasks
Responsible Personnel
Line voltage measured
Electrician and Customer
Engineer (CE)
Power line frequency measured (if required)
CE
Power line noise levels measured (if required)
CE
Neutral or ground noise/voltage levels measured
CE
Safety and ground connections verified
Electrician and CE
Advice on correct circuit breakers and wire size
Electrician and CE
Verification that maintenance power outlets
(those used for floor cleaning, etc.) are on
separate circuits from the computer system
Electrician and CE
Recommendations about lightning protection
CE
Measurements and recommendations on
radiated interference
CE
Answers to questions concerning modems and
modem options
Applications Engineer (AE)
Thermal load of HP equipment
CE
Thermal load of non-HP equipment
Customer and Equipment
Vendor
Modifications to existing electrical service
Electrician and Customer
Modifications to existing air conditioning
A/C Contractor and Customer
Environmental contaminants
CE and Environmental
Engineer/Contractor
Placement of equipment (for service access)
CE