HP Visualize J5000 hp Visualize J5000, J7000 workstations site preparation gui - Page 14
Selection of Site Personnel, Site Coordinator, Principal Operator
View all HP Visualize J5000 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 14 highlights
NOTE Introduction Customer Responsibilities communications equipment such as: • Any hardware or cables for connection or installation of data communications equipment • Network links • Telephone equipment • Modems (Consult with your CE for Hewlett-Packard requirements.) • Equipment supplied by companies other than HP Communications equipment at the computer site is not part of the computer and must be considered separately for power, space, interface cabling, and cooling requirements. Selection of Site Personnel Depending on the complexity of the computer system, the customer is responsible for selecting a Site Coordinator, Principal Operator, and a Site Planning Team. Depending on customer requirements, the Principal Operator may or may not perform all of these tasks. In some installations there may be two or three people assigned to the various "operator" responsibilities. Site Coordinator The Site Coordinator is responsible for the following tasks: • Establishing and maintaining site preparation schedules • Coordinating construction efforts • Being the primary liaison with Hewlett-Packard representatives Principal Operator The Principal Operator is responsible for the following tasks: • System operation • Monitoring site preparation 10 Chapter 1
-
1
-
2
-
3
-
4
-
5
-
6
-
7
-
8
-
9
-
10
-
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
-
26
-
27
-
28
-
29
-
30
-
31
-
32
-
33
-
34
-
35
-
36
-
37
-
38
-
39
-
40
-
41
-
42
-
43
-
44
-
45
-
46
-
47
-
48