HP Visualize J5000 hp Visualize J5000, J7000 workstations site preparation gui - Page 18

Site Planning Time Table

Page 18 highlights

NOTE Site Preparation Guidelines Site Planning Time Table Site Planning Time Table The guidelines below are a summary of the Pre-Installation Worksheet in Appendix A of this manual. The worksheet should be used to monitor the progress of pre-installation preparation. Since the time from placing an order to actual delivery may vary, it is suggested that you confer with your Hewlett-Packard CE and Sales Representative, your electrician, and others to determine the best estimated delivery dates for the preparation of your site. The following are four items that may require several weeks lead time: • Arranging for an electrician • Adding air conditioning • Building alterations • Placing orders for data communications equipment Due to potential delays, Hewlett-Packard recommends that the suppliers of the above services be contacted as soon as possible after your computer system has been ordered. There are four items that may require up to six weeks lead time: • Assigning your Principal Operator. • When your purchase order has included the optional site planning visit, scheduling this visit with the Hewlett-Packard CE to answer your questions about site preparation. • Selecting an appropriate system location and planning the physical arrangement of the system, including any related furniture. • Ordering any consumable supplies, including any appropriate storage media (such as DDS tapes or floppy diskettes). To schedule the site planning visit, three days advance notice is required. 14 Chapter 2

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48

14
Chapter 2
Site Preparation Guidelines
Site Planning Time Table
Site Planning Time Table
The guidelines below are a summary of the Pre-Installation Worksheet
in Appendix A of this manual. The worksheet should be used to monitor
the progress of pre-installation preparation. Since the time from placing
an order to actual delivery may vary, it is suggested that you confer with
your Hewlett-Packard CE and Sales Representative, your electrician,
and others to determine the best estimated delivery dates for the
preparation of your site.
The following are four items that may require several weeks lead time:
Arranging for an electrician
Adding air conditioning
Building alterations
Placing orders for data communications equipment
Due to potential delays, Hewlett-Packard recommends that the suppliers
of the above services be contacted as soon as possible after your computer
system has been ordered.
There are four items that may require up to six weeks lead time:
Assigning your Principal Operator.
When your purchase order has included the optional site planning
visit, scheduling this visit with the Hewlett-Packard CE to answer
your questions about site preparation.
Selecting an appropriate system location and planning the physical
arrangement of the system, including any related furniture.
Ordering any consumable supplies, including any appropriate storage
media (such as DDS tapes or floppy diskettes).
NOTE
To schedule the site planning visit, three days advance notice is required.