HP XP P9500 Hitachi Dynamic Link Manager Software User Guide for VMWare (HIT52 - Page 151
OfflineC, hbaportwwn, Online, KAPL01104-I
View all HP XP P9500 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 151 highlights
Message ID Message Text Explanation KAPL01102-I KAPL01103-I KAPL01104-I KAPL01107-I All the paths which pass the Details specified aa...aa port will be changed to the Offline(C) status. Is this OK? [y/n]: Multiple paths will be collectively placed Offline(C) because the hbaportwwn parameter was specified. To collectively place multiple paths Offline(C), enter y. To not collectively place them Offline(C), enter n. aa...aa: HBA Action If you want to execute the offline processing for the paths which pass the specified target, enter y. If you want to terminate the processing, enter n. If you are sure that there would be no problem when all the paths which pass the specified aa...aa port are placed in the Offline(C) status, enter y. Otherwise, enter n. [y/n]: Details This message re-asks the user whether to place all the paths Offline(C). To place all the paths Offline(C), enter y. To not place them Offline(C), enter n. aa...aa: HBA Action If you want to execute the offline processing for the paths which pass the specified target, enter y. If you want to terminate the processing, enter n. All the paths which pass the specified aa...aa port will be changed to the Online status. Is this OK? [y/n]: Details Multiple paths will be collectively placed Online because the hbaportwwn parameter was specified. To collectively place multiple paths Online, enter y. To not collectively place them Online, enter n. aa...aa: HBA Action If you want to execute the online processing for the paths which pass the specified target, enter y. If you want to terminate the processing, enter n. The load balancing type specified for individual LUs will become invalid when this operation is executed. Do you want to execute the operation Action If you want to change the load balancing algorithm for the system, enter y. If you want to terminate processing, enter n. Messages Hitachi Dynamic Link Manager User Guide (for VMware(R)) 8-17