LiftMaster HDSW24UL Installation Manual - English - Page 11
Step 1 Determine Location for Concrete Pad and Operator, Standard Installation
View all LiftMaster HDSW24UL manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 11 highlights
INSTALLATION • To AVOID damaging gas, power or other underground utility lines, • ALWAYS wear protective gloves and eye protection when changing contact underground utility locating companies BEFORE digging more the battery or working around the battery compartment. than 18 inches (46 cm) deep. Step 1 Determine Location for Concrete Pad and Operator DO NOT run the operator until instructed. To optimize performance and extend operator life, the long arm kit model HDLGARM is recommended when installing with gates 16 ft. or longer. Follow the installation instructions included with the kit. See Accessories page 53. The illustration below shows the recommended dimensions for a standard installation using the standard arm provided with the operator. If these dimensions are not applicable for your installation refer to the charts on the following page for alternate dimensions. Standard Installation Refer to the illustration to determine the measurements and location of the concrete pad. NOTE: There should only be a maximum of 4" (10.2 cm) from the center of the hinge to the edge of the post or column. If the distance is greater than 4" (10.2 cm) entrapment protection for this area is required. 4" (10.2 cm) maximum Outside Property Hinge Center 46" (116.8 cm) 25" (63.5 cm) 10" (25.4 cm) Inside Property 2" (5.1 cm) Long Arm Section 35.5" (90.2 cm) 11" 27.9 cm) Short Arm Section 29.5" (74.9 cm) 28" (71.1 cm) Concrete Pad 24" (61 cm) 11