LiftMaster HDSW24UL Installation Manual - English - Page 13
Step 2 Concrete Pad and Operator Attachment
View all LiftMaster HDSW24UL manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 13 highlights
INSTALLATION Step 2 Concrete Pad and Operator Attachment CHECK the national and local building codes before installation. NOTE: When lifting the operator use the handle to avoid damaging the operator 1. Install the electrical conduit. 2. Pour a concrete pad (reinforced concrete is recommended). The concrete pad should be 6 inches (15.2 cm) above the ground and deeper than the frost line. Ensure the pad is tall enough to avoid possible flooding. 3. Secure the operator to the concrete pad with appropriate fasteners. NOTE: An alternative to a concrete pad is to post mount the operator, see Accessories. 4.5" 5.5" Conduit Location (11.4 cm) (14 cm) 4" (10.1 cm) 1" (2.5 cm) 6.5" (16.5 cm) Conduit 1.5" (3.8 cm) 10" (25.4 cm) 15" (38.1 cm) Pad 24" (61 cm) 14" (35.6 cm) 28" (71.1 cm) 20" (50.8 cm) 3" (7.6 cm) Mounting Footprint 14.82" (37.6 cm) 12.2" (31 cm) 6.1" (15.5 cm) 2.5" (6.3 cm) 16.4" (41.7 cm) Cover Mounting Distance 6" (15.2 cm) Above Ground Below the frost line. Check all national and local codes. 28" (71.1 cm) Post Mount 6 Concrete Anchors 1/2" x 3 1/2" 24" (61 cm) 13