Schwinn 130 Upright Bike 2020 model Service Manual - Page 41
Mast and Handlebar Bracket.
View all Schwinn 130 Upright Bike 2020 model manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 41 highlights
Disconnect all power to the machine before you service it. Note: Your machine may not match the image. For reference only. 1. Remove the four screws that attach the Console to the Mast. Carefully lift the Console off the Mast. 2. Disconnect the Data Cable and Heart Rate Cable from the back of the Console, and remove it. Note: D o not let the cables fall down inside the Mast. This step may require two people. X4 #2 3. Remove the Handlebar Bracket Cover and set it safely aside for reassembly. 4. Tie the length of string to the end of the Heart Rate Cable at the top of the Mast. Grasp the section of Heart Rate (HR) Cable under the Handlebar Bracket and carefully pull the cable and string down through the Mast and out of the hole so that the string extends through the the Mast and Handlebar Bracket. Note: D o not let the Data Cable fall down inside the Mast. 41