Schwinn 130 Upright Bike 2020 model Service Manual - Page 48
Cable from the Main Frame.
View all Schwinn 130 Upright Bike 2020 model manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 48 highlights
5. Tie the length of string to the end (A) of the Data Cable at the base of the Mast. Hold the other end of the Data Cable (B) and B carefully pull it out of the Mast so that the string extends through A the length of the Mast. Untie the string from the old Data Cable and discard the old cable. NOTICE: D o not pinch or cut the HR cable (C). C 6. Tie the end of the string at the base of the Mast to one end of the replacement Data Cable. Hold the other end of the string and carefully pull the new Data Cable through the Mast. NOTICE: Do not pinch or cut the cables. 7. Untie the string from the Data Cable and connect the cable to the Data Cable from the Main Frame. . NOTICE: D o not pinch or cut the cables. This step may require two people. 8. Using a 6mm hex wrench, install the Console Mast, Mast Gasket and Top Shroud to the Main Assembly NOTICE: M ake sure the Console Cable does not fall into the Console Mast. Align the clips on the cable connectors and make sure the connectors lock. Do not pinch or cut the Console Cable. Be sure the tabs on the Top Shroud snap into the Main Assembly. X4 6 mm 48