Weider Pro 9300 English Manual - Page 18

Pulley 82. Attach the Pulley to the Ab

Page 18 highlights

43. Wrap the Ab Cable (85) around a 3 1/2" 43 Pulley (82). Attach the Pulley and a Cable Trap (80) to the Ab Upright (1) with the 3/8" x 3 3/4" Bolt (76) and a 3/8" Nylon Locknut (42). Be sure that the Cable Trap is in the indi- cated position. 44. Remove the indicated 3/8" x 2" Bolt (50), the 3/8" Nylon Locknut (42), the 3 1/2" Pulley 44 (82), and the Cable Trap (80) from the indicat- ed Pulley Plates (31). Lay the Ab Cable (85) over the Pulley. Reattach the Pulley and the Cable Trap to the lowest hole in the Pulley Plates with the Bolt and the Nylon Locknut. Make sure that the Cable Trap is turned to hold the Cable in place. 45. Wrap the Ab Cable (85) around a 3 1/2" Pulley (82). Attach the Pulley to the Ab 45 Upright (1) with the 3/8" x 3 3/4" Bolt (76), a 3/8" Washer (38), and a 3/8" Nylon Locknut (42). The ball on the Cable must be on the indicated side of the Pulley. Be sure that the Cable is between the Pulley and the post, and that the Cable and Pulley move smoothly. 1 42 85 80 82 76 31 42 50 82 80 85 CABLE ASSEMBLY 85 1 42 38 Post 82 76 18

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33

18
43. Wrap the Ab Cable (85) around a 3 1/2”
Pulley (82). Attach the Pulley and a Cable
Trap (80) to the Ab Upright (1) with the 3/8” x
3 3/4” Bolt (76) and a 3/8” Nylon Locknut (42).
Be sure that the Cable Trap is in the indi-
cated position.
44. Remove the indicated 3/8” x 2” Bolt (50), the
3/8” Nylon Locknut (42), the 3 1/2” Pulley
(82), and the Cable Trap (80) from the indicat-
ed Pulley Plates (31). Lay the Ab Cable (85)
over the Pulley. Reattach the Pulley and the
Cable Trap to the
lowest
hole in the Pulley
Plates with the Bolt and the Nylon Locknut.
Make sure that the Cable Trap is turned to
hold the Cable in place.
45. Wrap the Ab Cable (85) around a 3 1/2”
Pulley (82). Attach the Pulley to the Ab
Upright (1) with the 3/8” x 3 3/4” Bolt (76), a
3/8” Washer (38), and a 3/8” Nylon Locknut
(42).
The ball on the Cable must be on the
indicated side of the Pulley. Be sure that
the Cable is between the Pulley and the
post, and that the Cable and Pulley move
smoothly.
43
44
45
CABLE ASSEMBLY
42
31
42
82
80
50
80
82
85
76
1
42
38
82
76
Post
85
1
85