Weider X2 Uk Manual - Page 13

an M10 x 80mm Bolt 56, an M10 Flat Washer 62

Page 13 highlights

22. Identify the Low Cable (40), which is the only remain- 22 ing Cable. Note that there is a loop on one end of the cable and a ball on the other. 8 Route the end of the Low Cable (40) with the ball 62 under a 90mm Pulley (50) as shown. Attach the 60 Pulley to the indicated hole in the Leg Lever (8) with an M10 x 80mm Bolt (56), an M10 Flat Washer (62), and an M10 Nylon Locknut (60). Make sure that the Cable is between the Pulley and the bracket on the Leg Lever. 40 50 56 23. Wrap the Low Cable (40) around a 90mm Pulley (50) 23 in the direction shown. Attach the Pulley and two Pulley Covers (28) to the indicated hole in the Front Upright (4) with an M10 x 95mm Bolt (55), two M10 Flat Washers (62), and an M10 Nylon Locknut (60). 4 60 62 28 40 50 62 28 55 24. Wrap the Low Cable (40) around a 90mm Pulley (50) 24 in the direction shown. Attach the Pulley and two Pulley Covers (28) to the lower half of the Pulley Frame (27) with an M10 x 50mm Bolt (54) and an M10 Nylon Locknut (60). 27 60 28 54 50 28 40 25. Wrap the Low Cable (40) around a 90mm Pulley (50) in the direction shown. Attach the Pulley and two Pulley Covers (28) to the indicated bracket on the Base (1) with an M10 x 50mm Bolt (54), an M10 Flat Washer (62), and an M10 Nylon Locknut (60). 25 60 1 13 40 62 28 50 28 54

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25

13
22. Identify the Low Cable (40), which is the only remain-
ing Cable. Note that there is a loop on one end of the
cable and a ball on the other.
Route the end of the Low Cable (40) with the ball
under a 90mm Pulley (50) as shown. Attach the
Pulley to the indicated hole in the Leg Lever (8) with
an M10 x 80mm Bolt (56), an M10 Flat Washer (62),
and an M10 Nylon Locknut (60).
Make sure that the
Cable is between the Pulley and the bracket on
the Leg Lever.
22
60
50
40
62
56
8
23. Wrap the Low Cable (40) around a 90mm Pulley (50)
in the direction shown. Attach the Pulley and two
Pulley Covers (28) to the indicated hole in the Front
Upright (4) with an M10 x 95mm Bolt (55), two M10
Flat Washers (62), and an M10 Nylon Locknut (60).
23
62
40
60
28
28
55
4
50
62
24. Wrap the Low Cable (40) around a 90mm Pulley (50)
in the direction shown. Attach the Pulley and two
Pulley Covers (28) to the lower half of the Pulley
Frame (27) with an M10 x 50mm Bolt (54) and an
M10 Nylon Locknut (60).
24
28
50
40
27
60
54
28
25. Wrap the Low Cable (40) around a 90mm Pulley (50)
in the direction shown. Attach the Pulley and two
Pulley Covers (28) to the indicated bracket on the
Base (1) with an M10 x 50mm Bolt (54), an M10 Flat
Washer (62), and an M10 Nylon Locknut (60).
25
28
50
60
62
28
1
54
40