Weider X2 Uk Manual - Page 13
an M10 x 80mm Bolt 56, an M10 Flat Washer 62
View all Weider X2 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 13 highlights
22. Identify the Low Cable (40), which is the only remain- 22 ing Cable. Note that there is a loop on one end of the cable and a ball on the other. 8 Route the end of the Low Cable (40) with the ball 62 under a 90mm Pulley (50) as shown. Attach the 60 Pulley to the indicated hole in the Leg Lever (8) with an M10 x 80mm Bolt (56), an M10 Flat Washer (62), and an M10 Nylon Locknut (60). Make sure that the Cable is between the Pulley and the bracket on the Leg Lever. 40 50 56 23. Wrap the Low Cable (40) around a 90mm Pulley (50) 23 in the direction shown. Attach the Pulley and two Pulley Covers (28) to the indicated hole in the Front Upright (4) with an M10 x 95mm Bolt (55), two M10 Flat Washers (62), and an M10 Nylon Locknut (60). 4 60 62 28 40 50 62 28 55 24. Wrap the Low Cable (40) around a 90mm Pulley (50) 24 in the direction shown. Attach the Pulley and two Pulley Covers (28) to the lower half of the Pulley Frame (27) with an M10 x 50mm Bolt (54) and an M10 Nylon Locknut (60). 27 60 28 54 50 28 40 25. Wrap the Low Cable (40) around a 90mm Pulley (50) in the direction shown. Attach the Pulley and two Pulley Covers (28) to the indicated bracket on the Base (1) with an M10 x 50mm Bolt (54), an M10 Flat Washer (62), and an M10 Nylon Locknut (60). 25 60 1 13 40 62 28 50 28 54