Brother International BES-941BC Instruction Manual - English - Page 27
BES-1241BC, while pressing the left
View all Brother International BES-941BC manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 27 highlights
BES-1241BC Chapter 1 Preparation of Embroidery Machine Bridge r Connecting shaft Fixing bracket Fixing bracket B !1 !2 o t q !0 o q o u y i e w 1. Remove 3 pieces of fixing screw q, loosen 2 pieces of screw w and remove the color change cover e. 2. Remove the bolts r and detach the fixing bracket for transportation from the bridge and the connecting shaft. 3. Loosen the bolts t and set screw !,0 and move the needle bar case y left side. 4. Press the change bracket collar i against the change case base u, while pressing the left side change bracket collar o against the change case base u, and tighten the bolts t and set screw !0. Check that needle bar No.1 and 12 are inserted into the needle plate holes smoothly. (Notes) • Check that ther is no play for the connecting shaft in the horizontal direction. • Never loose the bolt of the change bracket coller i. If this bolt is loosened, the change bracket coller i will be dislocated and the position of the needle bar case y will need to be adjusted. 5. Attach the color change cover e by 3 pieces of fixing screw q and 2 pieces of fixing screw w. 6. Attach the linear guide cover !1 by 2 pieces of tightening screw !.2 BES-941BC • BES-1241BC 25