Brother International KE-430F Basic Instruction Manual - English - Page 32
INSTALLATION, <100 V / 400 V system >
View all Brother International KE-430F manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 32 highlights
4. INSTALLATION Operator (1) Power switch (2) Screws [2 pcs] 4145M 2348B (3) Transformer box (4) Transformer box plates [2 pcs] (5) Screw [with washer] (6) 3-pin power supply connector (7) Staples [6 pcs] (8) Cord clamps [2 pcs] (9) Power cord 1. Attach an appropriate plug to the power cord (9). (The green and yellow wire is the ground wire.) 2. Insert the power plug into a properly-grounded AC power supply. * The inside of the control box uses single-phase power. NOTE: • If the ground connection is not secure, electric shocks, operating errors or damage to electronic components such as P.C. boards may occur. • Take care when tapping in the staples (7) to make sure that they do not pierce the cords. • Do not use extension cords, otherwise machine operation problems may result. 3. Use the six screws to tighten the cover of the control box. Check that none of the cords are being clamped by the cover at this time. Green and yellow wire (ground wire) 2351B 24 KE-430F, BE-438F