Dell PowerConnect 2808 Getting Started Guide - Page 8
Unpacking
View all Dell PowerConnect 2808 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 8 highlights
Before installing the device, verify that the site selected for the device meets the following site requirements: • Power - The device is installed within 1.5 m (5 feet) of a grounded, easily accessible outlet 220/110 VAC, 50/60 Hz. • General - Ensure that the power supply is correctly installed. • Clearance - There is adequate frontal clearance for operator access. Allow clearance for cabling, power connections, and ventilation. • Cabling - Cabling is routed to avoid sources of electrical noise such as radio transmitters, broadcast amplifiers, power lines, and fluorescent lighting fixtures. • Ambient Requirements - The ambient device operating temperature range is 0 to 45 °C (32 to 113 °F) at a relative humidity of up to 95%, non-condensing. Verify that water or moisture cannot enter the device case. Unpacking Package Contents While unpacking the device, ensure that the following items are included: • The device • AC power cable • Self-adhesive rubber pads (for on-shelf installation) • Rack-mount kit for installation • Documentation CD • Product Information Guide Unpacking the Device To unpack the PowerConnect device: NOTE: Before unpacking the device, inspect the packaging and report any evidence of damage. 1 Place the box on a clean flat surface. 2 Open the box or remove the box top. 3 Carefully remove the device from the package and place it on a secure, stable and clean surface. 4 Remove all packing material. 5 Inspect the product for damage. Report any damage immediately. 6 Installation