Dell S4148U-ON EMC PowerSwitch S4100–ON Series Installation Guide M - Page 23
S4100–ON Series installation, Unpack the switch, Unpack
View all Dell S4148U-ON manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 23 highlights
4 S4100-ON Series installation To install the S4100-ON Series (S4128F-ON, S4148F-ON, S4148FE-ON, S4128T-ON, S4148T-ON, and S4148U-ON), complete the installation procedures in the order presented in this section. Always handle the S4100-ON Series switch and its components with care. Avoid dropping the switch or any field replaceable units (FRUs). CAUTION: ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap when handling the S4100-ON Series switch and its components. As with all electrical devices of this type, take all the necessary safety precautions to prevent injury when installing this switch. NOTE: For more information, see the Open Networking Hardware Diagnostic Guide found at the following sites: ● S4148F-ON, S4148T-ON, S4148FE-ON: www.dell.com/support/S4148F-ON/S4148T-ON/S4148FE-ON ● S4128T-ON, S4148T-ON: www.dell.com/support/S4128T-ON/S4148T-ON ● S4148U-ON: www.dell.com/support/S4148U Topics: • Unpack the switch • Rack or cabinet installation • ReadyRails installation • S4100-ON Series installation • Optics installation • Switch power-up • After switch installation • Switch replacement Unpack the switch NOTE: Before unpacking the switch, inspect the container and immediately report any evidence of damage. When unpacking the S4100-ON Series switch, make sure that the following items are included: ● One S4100-ON Series (S4128F-ON, S4148F-ON, S4148FE-ON, S4128T-ON, S4148T-ON, or S4148U-ON) switch ● One RJ-45 to DB-9 female cable ● Two sets of rail kits, no tools required ● Two PSUs ● Four fan units ● Two country- and region-specific AC power cords ● Dell S4100-ON Series Setup Guide ● Safety and Regulatory Information ● Warranty and Support Information Unpack 1. Place the container on a clean, flat surface and cut all straps securing the container. 2. Open the container or remove the container top. 3. Carefully remove the switch from the container and place it on a secure and clean surface. 4. Remove all packing material. 5. Inspect the product and accessories for damage. S4100-ON Series installation 23