4 S4100-ON Series installation To install the S4100-ON Series (S4128F-ON, S4148F-ON, S4148FE-ON, S4128T-ON, S4148T-ON, and S4148U-ON), complete the installation procedures in the order presented in this section. Always handle the S4100-ON Series switch and its components with care. Avoid dropping the switch or any field replaceable units (FRUs). CAUTION: ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap when handling the S4100-ON Series switch and its components. As with all electrical devices of this type, take all the necessary safety precautions to prevent injury when installing this switch. NOTE: For more information, see the Open Networking Hardware Diagnostic Guide found at the following sites: ● S4148F-ON, S4148T-ON, S4148FE-ON: www.dell.com/support/S4148F-ON/S4148T-ON/S4148FE-ON ● S4128T-ON, S4148T-ON: www.dell.com/support/S4128T-ON/S4148T-ON ● S4148U-ON: www.dell.com/support/S4148U Topics: • Unpack the switch • Rack or cabinet installation • ReadyRails installation • S4100-ON Series installation • Optics installation • Switch power-up • After switch installation • Switch replacement Unpack the switch NOTE: Before unpacking the switch, inspect the container and immediately report any evidence of damage. When unpacking the S4100-ON Series switch, make sure that the following items are included: ● One S4100-ON Series (S4128F-ON, S4148F-ON, S4148FE-ON, S4128T-ON, S4148T-ON, or S4148U-ON) switch ● One RJ-45 to DB-9 female cable ● Two sets of rail kits, no tools required ● Two PSUs ● Four fan units ● Two country- and region-specific AC power cords ● Dell S4100-ON Series Setup Guide ● Safety and Regulatory Information ● Warranty and Support Information Unpack 1. Place the container on a clean, flat surface and cut all straps securing the container. 2. Open the container or remove the container top. 3. Carefully remove the switch from the container and place it on a secure and clean surface. 4. Remove all packing material. 5. Inspect the product and accessories for damage. S4100-ON Series installation 23

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49

S4100–ON Series installation
To install the S4100–ON Series (S4128F-ON, S4148F-ON, S4148FE-ON, S4128T-ON, S4148T-ON, and S4148U-ON), complete
the installation procedures in the order presented in this section.
Always handle the S4100–ON Series switch and its components with care. Avoid dropping the switch or any field replaceable
units (FRUs).
CAUTION:
ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel
ground strap when handling the S4100–ON Series switch and its components. As with all electrical devices of
this type, take all the necessary safety precautions to prevent injury when installing this switch.
NOTE:
For more information, see the
Open Networking Hardware Diagnostic Guide
found at the following sites:
S4148F-ON, S4148T-ON, S4148FE-ON:
www.dell.com/support/S4148F-ON/S4148T-ON/S4148FE-ON
S4128T-ON, S4148T-ON:
www.dell.com/support/S4128T-ON/S4148T-ON
S4148U-ON:
www.dell.com/support/S4148U
Topics:
Unpack the switch
Rack or cabinet installation
ReadyRails installation
S4100-ON Series installation
Optics installation
Switch power-up
After switch installation
Switch replacement
Unpack the switch
NOTE:
Before unpacking the switch, inspect the container and immediately report any evidence of damage.
When unpacking the S4100–ON Series switch, make sure that the following items are included:
One S4100–ON Series (S4128F-ON, S4148F-ON, S4148FE-ON, S4128T-ON, S4148T-ON, or S4148U-ON) switch
One RJ-45 to DB-9 female cable
Two sets of rail kits, no tools required
Two PSUs
Four fan units
Two country- and region-specific AC power cords
Dell S4100–ON Series Setup Guide
Safety and Regulatory Information
Warranty and Support Information
Unpack
1.
Place the container on a clean, flat surface and cut all straps securing the container.
2.
Open the container or remove the container top.
3.
Carefully remove the switch from the container and place it on a secure and clean surface.
4.
Remove all packing material.
5.
Inspect the product and accessories for damage.
4
S4100–ON Series installation
23