Dell S4148U-ON EMC PowerSwitch S4100–ON Series Installation Guide M - Page 27

Four-post threaded installation, Two-post center-mount installation

Page 27 highlights

Figure 19. Two-post center-mount installation 2. Slide the back bracket towards the post. Secure it to the post flange with two user-supplied screws, items 2 and 3. 3. Repeat this procedure for the second rail. Four-post threaded installation NOTE: For more installation instructions, see the installation labels attached to the rail assembly. 1. Remove the latch castings from each end of the ReadyRails assemblies. To remove the two screws each latch casting, use a Torx driver. Retain the latch castings for future rack requirements. S4100-ON Series installation 27

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49

Figure 19. Two-post center-mount installation
2.
Slide the back bracket towards the post. Secure it to the post flange with two user-supplied screws, items 2 and 3.
3.
Repeat this procedure for the second rail.
Four-post threaded installation
NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
1.
Remove the latch castings from each end of the ReadyRails assemblies. To remove the two screws each latch casting, use a
Torx driver.
Retain the latch castings for future rack requirements.
S4100–ON Series installation
27