Dell S6000 Dell Networking System Getting Started Guide - Page 23

Two-Post Center-Mount Configuration, Four-Post Threaded Configuration

Page 23 highlights

Two-Post Center-Mount Configuration: 1 Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post flange with two user-supplied screws. Refer to Figure 4-3, item 1. Figure 4-3. Two-Post Center-Mount Configuration 2 Slide the back bracket towards the post and secure it to the post flange with two user-supplied screws. Refer to Figure 4-3, item 2. 3 Repeat this procedure for the second rail. Four-Post Threaded Configuration: 1 For this configuration, remove the flange ear castings from each end of the ReadyRails assemblies. Use a Torx driver to remove the two screws from each flange ear and remove each casting. Refer to Figure 4-4, item 1. Retain the castings for future rack requirements. 2 For each rail, attach the front and rear flanges to the post flanges with two user-supplied screws at each end. Refer to Figure 4-4, item 2. Installation 19

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37

Installation
19
Two-Post Center-Mount Configuration:
1
Slide the plunger bracket rearward until it clicks into place and secure the
bracket to the front post flange with two user-supplied screws. Refer
to
Figure 4-3
, item 1.
Figure 4-3.
Two-Post Center-Mount Configuration
2
Slide the back bracket towards the post and secure it to the post flange with
two user-supplied screws. Refer to
Figure 4-3
, item 2.
3
Repeat this procedure for the second rail.
Four-Post Threaded Configuration:
1
For this configuration, remove the flange ear castings from each end of the
ReadyRails assemblies. Use a Torx driver to remove the two screws from
each flange ear and remove each casting. Refer to
Figure 4-4
, item 1. Retain
the castings for future rack requirements.
2
For each rail, attach the front and rear flanges to the post flanges with two
user-supplied screws at each end. Refer to
Figure 4-4
, item 2.