Dell S6000 Dell Networking System Getting Started Guide - Page 23
Two-Post Center-Mount Configuration, Four-Post Threaded Configuration
View all Dell S6000 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 23 highlights
Two-Post Center-Mount Configuration: 1 Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post flange with two user-supplied screws. Refer to Figure 4-3, item 1. Figure 4-3. Two-Post Center-Mount Configuration 2 Slide the back bracket towards the post and secure it to the post flange with two user-supplied screws. Refer to Figure 4-3, item 2. 3 Repeat this procedure for the second rail. Four-Post Threaded Configuration: 1 For this configuration, remove the flange ear castings from each end of the ReadyRails assemblies. Use a Torx driver to remove the two screws from each flange ear and remove each casting. Refer to Figure 4-4, item 1. Retain the castings for future rack requirements. 2 For each rail, attach the front and rear flanges to the post flanges with two user-supplied screws at each end. Refer to Figure 4-4, item 2. Installation 19